FREE 30-MIN CALLFree 30-min call

GUIDE

GDPR transfer impact assessment. Document the decision.

Signing contractual clauses does not automatically complete the assessment. Organisations need to understand the transfer, mechanism, third-country context, possible access and effectiveness of supplementary measures.

⏱ 7 min read17 partsFree guide

Quick answer

A transfer impact assessment (TIA) is the documented check an EU exporter performs before sending personal data to a country without an adequacy decision, such as Morocco. It asks whether the safeguards in place (usually standard contractual clauses) can be respected in practice given local law, public authority access and the importer's own measures. The exporter owns it, but the Moroccan importer supplies the facts.

The essentials in 30 seconds
  • Required since the Schrems II ruling (CJEU, 2020)
  • Complements SCCs, never replaces them
  • Describes the transfer, the destination law, the practices and the added measures
  • The EU exporter signs it; the importer provides accurate input
  • Review it when hosting, law or use changes
DIRECT ANSWER

A Transfer Impact Assessment, or TIA, documents a third-country transfer: actors, personal data, purposes, frequency, transfer mechanism, relevant law and practices, technical and organisational measures, residual risk, decision and reassessment.

SubjectTransfer

Flows and remote access

OutputDecision

Residual risk

FormatPDF

Downloadable checklist

01Describe the transfer

Actors

Identify exporter, importer, subprocessors and teams with access.

Data

Document categories, volume, sensitivity, individuals, purpose and frequency.

Architecture

Map storage, transit, support, administration, backups and emergency access.

A GDPR question about your own case?

Talk to a DPO for 30 minutes, free of charge: they tell you what applies to your company and where to start.

02Assess the mechanism and context

Mechanism

Identify adequacy, Standard Contractual Clauses, binding corporate rules or an exceptional derogation.

Third country

Assess relevant law and practices concerning public-authority access in the context of the specific transfer.

Documented experience

Use factual, transparent and verifiable information from the importer carefully and in context.

03Measures and decision

Technical measures

Assess encryption, pseudonymisation, key separation and data minimisation for the use case.

Contractual and organisational measures

Consider notification, challenge, transparency, access procedures and permission controls.

Conclusion

Record the decision, residual risk, conditions, owner, approval date and review trigger.

04Where the obligation comes from

In July 2020 the Court of Justice of the European Union confirmed that standard contractual clauses remain valid, but added a condition: the exporter must check, case by case, whether the law and practice of the destination country allow the clauses to be respected, particularly where public authorities can access data. The European Data Protection Board later published recommendations on how to carry out that check.

The check is now commonly called a transfer impact assessment. It applies to transfers to any country that lacks an adequacy decision, which currently includes Morocco.

05The six steps of a TIA

StepQuestionImporter's input
1. Describe the transferWhich data, which people, which purposes, how often?Accurate description of your service and data
2. Identify the transfer toolWhich safeguard is used?Signed SCCs and appendices
3. Assess destination law and practiceCan authorities access the data, and with what safeguards?Facts on the Moroccan framework and your experience
4. Add measures if neededCan technical or organisational steps close the gap?Encryption, access limits, procedures
5. ConcludeCan the transfer proceed?Confirmation of what you can really implement
6. ReviewWhen will the assessment be revisited?Prompt notice of any change

06Who does what

ActorRole
EU customer (exporter)Leads the assessment, concludes and is accountable
Moroccan supplier (importer)Provides accurate information and flags changes
Customer's DPOReviews and advises
Your DPO or adviserPrepares your file and checks your answers
Key point

Inaccurate answers can create contractual liability for the supplier, so have the file reviewed before sending it.

07Preparing a reusable file for Morocco

Most European customers do not know Moroccan law in detail, so a short and factual note helps. It can recall that Morocco has had a data protection law since 2009 (Law 09-08), an independent authority (the CNDP), prior formalities and recognised rights for individuals, and list the formalities your company has completed.

On public authority access, stay factual. Describe your real experience, for example that no request has been received so far, and your internal procedure if one arrived: who receives it, who checks it, who informs the customer. Avoid sweeping statements you cannot support.

  • Overview of your company and services
  • Diagram of systems and hosting locations
  • Encryption at rest and in transit, key management
  • Access control and logging
  • List of sub-processors and their countries
  • Policy on government access requests
  • CNDP filings and transfer authorisations

08Supplementary measures that often help

MeasureEffect
Encryption with keys held by the customerData unreadable outside the customer's control
PseudonymisationIndividuals not directly identifiable
Minimising transferred dataLess data exposed
Remote access without local storageData stays on the customer's servers
Commitment to notify access requestsCustomer informed of any authority request

09TIA and Moroccan filings: two sides of the same flow

A TIA is an EU-side exercise. Seen from Morocco, the same flows may also require authorisation from the CNDP when personal data leaves the country or is accessed from abroad. The two files should describe the same data, hosting and recipients. Preparing them together avoids contradictions that a customer's auditor will spot.

10Example: remote support for a hospital software (illustrative)

A Moroccan company supports software used by a European hospital. The hospital runs a TIA. The supplier explains that engineers access data through a remote session without copying it, that connections are encrypted and logged, that no authority request has been received and that a procedure exists if one is. The hospital concludes the transfer can continue with those measures and schedules a yearly review.

11Common mistakes

  • Letting the customer fill in your environment without checking
  • Giving generic answers with no facts
  • Forgetting to report a change of hosting provider
  • Confusing a TIA with a DPIA
  • Treating a TIA as permanent

12More questions answered

Is a TIA always required?

It is expected for transfers based on SCCs to countries without an adequacy decision. The depth depends on the risk and the data.

Does a TIA replace the SCCs?

No. The SCCs are the safeguard; the TIA checks that the safeguard can work in practice.

Can remote support access be a transfer?

Yes. Making personal data accessible from a third country, even without copying it, can be a transfer.

Does a GDPR TIA cover CNDP formalities?

No. They are separate: the TIA is EU-side, while CNDP authorisation is Moroccan-side. Prepare both with consistent facts.

When should a TIA be reviewed?

On any change of hosting, sub-processor, law or use, and at a regular interval agreed with the customer.

Can you prepare our file?

Yes. We build reusable TIA input files for Moroccan suppliers serving European customers.

13Move from checklist to a documented decision

Start with the actual transfer, not a template

A TIA should identify the exporter, importer, purpose, personal data and every party able to access it. Include subprocessors, support, administration, backups and emergency access. A country or vendor name alone does not describe the practical exposure that the assessment must address.

Distinguish storage, transit and remote access. Record frequency, duration, volume, sensitivity, re-identification potential and who controls the keys. This mapping supports selection of the relevant contractual module and measures designed for the actual use case rather than generic safeguards.

Assess context and measures with traceable evidence

The assessment considers whether relevant law and practices in the third country may affect the mechanism in the context of this transfer. Information should be reliable, verifiable, current and connected to the data and access concerned. The importer’s documented experience can inform the analysis but should not replace an independent and reasoned assessment.

Supplementary measures may be technical, contractual and organisational. Effectiveness is contextual: encryption offers different protection where the importer holds the keys and must process data in clear text. Record assumptions, limitations and the facts that would require the conclusion to change.

Decide, approve and reassess

The conclusion states whether the transfer may begin or continue, under which conditions and with what residual risk. Name the decision owner, action owners, deadlines and expected evidence. Where safeguards cannot provide the required protection, the transfer may need to be suspended, redesigned or replaced following competent assessment.

Set reassessment triggers such as a change of country, provider, subprocessor, architecture, data category, purpose or applicable law. For flows involving Morocco, a GDPR TIA does not replace the separate assessment of transfer formalities under Law 09-08 and CNDP procedures.

14Get the PDF version

Receive a preparation template before the legal and technical assessment.

15Frequently asked questions

Is a TIA always required?+

It is particularly relevant where a transfer relies on safeguards such as Standard Contractual Clauses and must be adapted to context.

Does a TIA replace the SCCs?+

No. It assesses whether the mechanism and measures provide essentially equivalent protection.

Can remote support access be a transfer?+

Yes. Access from a third country may be a transfer even where hosting remains in the EEA.

Does a GDPR TIA cover CNDP formalities?+

No. Moroccan Law 09-08 requirements must be assessed separately where applicable.

When should a TIA be reviewed?+

After changes to the vendor, country, architecture, data, applicable law or facts affecting the conclusion.

EDPB - Supplementary measuresEuropean Commission - Standard Contractual Clauses

This guide provides a general framework and does not replace an assessment of your circumstances or reserved legal advice.

16Assess a Morocco-Europe data transfer

RGPD Conseil Maroc maps the flow, reviews the documents and organises the required actions.

17Download the
full checklist.

The same checklist as a one-page PDF. Download the transfer impact assessment checklist (PDF) ↓

Keep reading

GDPR compliance

Audit, record of processing, policies and procedures: your Law 09-08 and GDPR compliance built on your real processing.

See the offer ↗ Free 30-min call ↗